Projects
-
2018 - 2020 Construction of Cogeneration Plant for Heat Only Boilers “Ovcha Kupel” Design, procurement, project management, tests, adjustment activities, commissioning, securing warranty measures. Научи повече
-
2016 - 2018 MODERNIZATION OF TURBOGENERATOR TG4 IN TPP "SOFIA IZTOK" WITH NEW ANTI-PRESSURE TURBINE Design, procurement, project management, tests, adjustment activities, commissioning, securing warranty measures. Научи повече
-
2012 - 2012 DESIGN, PROCUREMENT, DISMANTLING, MOUNTING, TESTS AND COMMISSIONING OF EQUIPMENT COMPONENTS OF PLANT GENERATOR No. 7 WATER-HYDROGEN COOLING It is an engineering project covering the activities as design, procurement, dismantling, mounting, and startup and checkout works related to Electrical, Machine and... Научи повече
-
2012 - 2013 UPDATING THE SECONDARY CIRCUIT THERMAL-HYDRAULIC MODEL FOR THE KOZLODUY NPP UNIT 6 FULL-SCOPE REPLICA CONTROL ROOM SIMULATOR The thermal-hydraulic model was updated by including a model of the separation system of the second steam extractor of turbine К-1000, as well as a model of the new... Научи повече
-
2012 - 2012 SIMPLIFIED ENERGY EFFICIENCY AUDIT OF THE ELECTRICALLY WELDED PIPES PRODUCTION WORKSHOP AT THE TOWN OF RUSE The simplified audit was part of the bidding documentation for funding through the Ministry of Economy, Energy and Tourism’s... Научи повече
-
2012 - 2012 DESIGN, CONSTRUCTION AND COMMISSIONING OF ELHOVO – 4 AND ELHOVO – 5 PHOTOVOLTAIC POWER PLANTS Installed power: 4MW and 5MW respectively. The construction of the Photovoltaic Power Plant (PPP) "Elhovo 4” includes the installation of 15,228 pieces of... Научи повече
-
2012 - 2012 DESIGN, CONSTRUCTION AND COMMISSIONING OF KURTOVO 1 AND KURTOVO 2 PHOTOVOLTAIC POWER PLANTS Installed power: 0.2 MW each The construction of the Photovoltaic Power Plant (PPP) "Kurtovo 1” includes the installation of 648 pieces of photovoltaic... Научи повече
-
2012 - 2012 DESIGN, CONSTRUCTION AND COMMISSIONING OF PHOTOVOLTAIC POWER PLANT “RABROVO" Installed power: 0.5 MW The construction of the Plant includes the installation of 1 728 pieces of photovoltaic panels (Monocrystalline, 300 Wp) on static metal... Научи повече
-
2012 - 2012 ENGINEERING FOR DESIGN, PROCUREMENT, DISMANTLING, INSTALLATION, STARTUP AND CHECKOUT WORKS AND COMMISSIONING OF GENERATOR No.6 AUTOMATIC EXCITATION CONTROLLER (AEC) Contract execution covers the following activities: Elaborating detailed design for existing AEC replacement by a new one; Procurement of new AEC and equipment... Научи повече
-
2012 - 2012 GENERATOR No. 1 RELAY PROTECTION REPLACEMENT BY MICROPROCESSOR ONES AT HEAT DISTRIBUTION SOFIA IZTOK Contract execution covers the following activities: Drafting detailed design for the new microprocessor protections; Procurement of microprocessor devices and... Научи повече
-
2012 - 2014 DESIGN, PROCUREMENT AND INSTALLATION OF PLANT AND EQUIPMENT FOR ON LINE LOAD MONITORING OF THE BELT CONVEYORS AND EXCAVATORS AND ELECTRIC POWER SUPPLY SYSTEM REHABILITATION The task includes design, procurement and plant and equipment installation for on-line load monitoring of the belt conveyors and excavators operation at Mini Maritsa... Научи повече
-
2011 - 2012 DESIGN, PROCUREMENT AND INSTALLATION OF A CO-GENERATION PLANT FOR HEAT AND ELECTRIC POWER GENERATION COGREEN LTD. In this project Risk Engineering Ltd. accomplished the conceptual and detailed design work for parts: architectural, civil structures, mechanical, water supply and... Научи повече
-
2011 - 2013 ENGINEERING SERVICES IN A PROJECT OF 35 MW TURBOGENERATOR AND AUXILIARY EQUIPMENT FOR “SOFIA” TPP The project is divided into several main stages, as described below. Stage 1. Elaboration of a technical design in parts: mechanical, civil structures, I&C,... Научи повече
-
2011 - 2011 DESIGN, PROCUREMENT, DISMANTLING, MOUNTING, TEST AND COMMISSIONING OF EQUIPMENT COMPONENTS FROM THE PLANT GENERATOR No. 5 WATER-HYDROGEN COOLING SYSTEM The engineering project covers the activities on design, procurement, dismantling, installation, and startup and checkout works related to the Electrical, Machine... Научи повече
-
2011 - 2013 UPGRADING THE KOZLODUY NPP UNIT 6 FULL SCOPE REPLICA CONTROL ROOM SIMULATOR WITH A MODEL OF CONTROL SAFETY SYSTEMS (CSS) The purpose of the project was to bring the simulator in full compliance with the type and behavior of the prototype Unit after commissioning of the modernized... Научи повече
-
2011 - 2014 DESIGN AND CONSTRUCTION OF A FACILITY FOR EQUIPMENT FRAGMENTATION AND DECONTAMINATION DURING DECOMMISSIONING The task includes: Elaboration of a concept for the technological equipment arrangement Development of conceptual, technical and detailed designs in all... Научи повече
-
2011 - 2011 SURVEY ON THE ENERGY EFFICIENCY OF RUBIN LTD. INDUSTRIAL SYSTEMS AT THE TOWN OF PLEVEN The contract was signed in compliance with the Energy Efficiency Act. In implementation of the contract the following documents were submitted to the Customer:... Научи повече
-
2011 - 2012 DESIGN, CONSTRUCTION AND COMMISSIONING OF DEBAR PHOTOVOLTAIC POWER PLANT Installed power: 2.5 MW The construction of the Plant includes the installation of 8 680 pieces of photovoltaic panels (Monocrystalline, 290 Wp) on static metal... Научи повече