Execution period 2012
Contractor Stamboliyski Municipality, the village of Kurtovo Konare

DESIGN, CONSTRUCTION AND COMMISSIONING OF KURTOVO 1 AND KURTOVO 2 PHOTOVOLTAIC POWER PLANTS

Installed power: 0.2 MW each

The construction of the Photovoltaic Power Plant (PPP) "Kurtovo 1” includes the installation of 648 pieces of photovoltaic panels (Monocrystalline, 300 Wp) on static metal structures, on the area of 3.5 dca. The panels are connected to 6 pieces of string inverters (3-phase, 30kW).The Plant is connected to the power distribution network through a new low voltage cable line with a length of 30 m, to a new transformer substation (type BKTP – Unit Switchgear Set Transformers, 630kVA, 0.4/20kV).

The construction of the Photovoltaic Power Plant (PPP) "Kurtovo 2” includes the installation of 756 pieces of photovoltaic panels (Monocrystalline, 300 Wp) on static metal structures, on the area of 4.0 dca. The panels are connected to 7 pieces of string inverters (3-phase, 30kW). The Plant is connected to the power distribution network through a new low voltage cable line with a length of 20m, to a new transformer substation (type BKTP – Unit Switchgear Set Transformers, 630kVA, 0.4/20kV).

In addition, the necessary electrical facilities have been constructed on the territories of both Plants: one Main distribution board (0.4kV) for each.

Monitoring systems have been introduced for the PPP operation in real-time, thereby providing monitoring of a number of main technical parameters. A thorough analysis of the operation of plants shall be made based on the incoming information and, if necessary, the trained personnel available shall undertake adequate measures to remove possible defects or accidents. The on-site security systems include: physical security, permanent video surveillance, security lighting and perimeter security for the entire length of safety fences of the Plants by sensor optical cables.