- 2008 - 2008 FACILITY FOR COMBINED HEAT AND ELECTRIC POWER GENERATION The Project covers the full-scope engineering of cogeneration plant for combined heat and electric power generation with the installed electric power of up to 300 kW... Научи повече
- 2008 - 2010 PROCUREMENT, DISMANTLING, MOUNTING AND COMMISSIONING OF WATER AND HYDROGEN COOLED GENERATORS The engineering project for the total replacement of 210МW Generators by new ones of 230МW includes the following activities: Design related to Electrical,... Научи повече
- 2008 - 2011 10.5МW TURBINE GENERATOR INSTALLATION AND COMMISSIONING, 6КV SWG REHABILITATION The task includes: new 10.5 MW turbine generator design and connection with the existing 6kV SWG, as well as cubicle retrofit with new breaker and relay protection... Научи повече
- 2008 - 2009 DEVELOPMENT OF SOFTWARE - COMPLEX DATABASE FOR SITE RADIATION MONITORING AND MONITORING OF THE ENVIRONMENT AT KOZLODUY NPP This software consisted of database developed to provide information to the operators on the current radiation parameters, to store and summarize the data related to... Научи повече
- 2008 - 2009 UNIT 6 FULL SCOPE SIMULATOR MODERNIZATION - UNIFIED COMPLEX OF TECHNOLOGICAL FEATURES, AUTOMATED SYSTEM FOR TECHNOLOGICAL PROCESS CONTROL, AND COMPUTER INFORMATION SYSTEM (CIS) The Unified Complex for Technological Features (UKTS), the Automated System for Technological Process Control, and the Computer Information System (CIS) were... Научи повече
- 2008 - 2008 UPGRADING THE KOZLODUY NPP UNIT 6 FULL SCOPE REPLICA CONTROL ROOM SIMULATOR WITH A MODEL OF THE CONTROL ROD DRIVE CONTROL SYSTEM The Control Rod Drive Control System was replaced in the framework of the KNPP Units 5&6 Modernization Program. The replacement took nine months and it was... Научи повече
- 2008 - 2009 SITE APPROVAL FOR THE CONSTRUCTION OF NATIONAL RADIOACTIVE WASTE REPOSITORY Risk Engineering Ltd. was the Contractor for Lot 4: “Feasibility Study, Updated Preliminary Analysis of the repository safety, and documentation set... Научи повече
- 2008 - 2010 INVESTIGATION OF THE POSSIBILITIES FOR CONSTRUCTION OF GEOLOGICAL REPOSITORY FOR HIGH–LEVEL AND LONG-LIVED RADIOACTIVE WASTES FROM SPENT FUEL REPROCESSING AND OTHER NUCLEAR APPLICATIONS IN BULGARIA The task included: Review of the global experience in high–level wastes and spent fuel disposal; Setting the scenarios for high–level wastes... Научи повече
- 2008 - 2013 DESIGN AND DELIVERY OF 6 KV BREAKERS The design and delivery of 6 kV breakers for switchgears 5 (6) BA, BB, BC, BD includes several stages: Stage I – Prototype classification: Calculation... Научи повече
- 2008 - 2010 DEVELOPMENT OF DESIGN AND TECHNICAL DOCUMENTATION OF THE ENGINEERED SAFETY FEATURES ACTUATION SYSTEM The task included delivery, dismantling of the old equipment; installation and adjustment of the new equipment. A Detailed Design was developed for the replacement... Научи повече
- 2007 - 2008 CONSTRUCTION AND ERECTION WORKS AT THE SITE OF TROYANOVO-3 MINE Construction and erection works at the site of Troyanovo-3 mine are at sub-site 110/20/6kV Substation No.7; Reconstruction of 20kV and 6kV SWGs and earth-fault... Научи повече
- 2007 - 2008 DESIGN, PROCUREMENT AND IMPLEMENTATION OF CRITICAL PARAMETERS MONITORING SYSTEM (CPMS) UNDER ACCIDENT AND POST-ACCIDENT SITUATIONS The purpose of the project is to implement a system for the monitoring of critical parameters (CPMS) after design basis and beyond design basis accidents, which... Научи повече
- 2007 - 2009 DESIGN, PROCUREMENT AND IMPLEMENTATION OF SAFETY PARAMETER DISPLAY SYSTEM – SPDS In the frames of KNPP Units 5&6 Modernization Program, Critical Safety Parameters Display System was designed and implemented. The purpose of the project is to... Научи повече
- 2007 - 2008 UPGRADING THE KOZLODUY NPP UNIT 6 FULL-SCOPE REPLICA CONTROL ROOM SIMULATOR WITH A MODEL OF THE OVATION COMPUTER INFORMATION SYSTEM (TURBINE CONTROL AUTOMATED SYSTEM, UKTS, CIS) The purpose of the project was to bring the simulator in full compliance with the type and behavior of the prototype Unit after commissioning of the distributer... Научи повече
- 2007 - 2009 ASSESSMENT FOR COMPLIANCE OF “DEPOT AND TRANSPORTATION CHART FOR SUPPLIES TO THE LIMESTONE WAREHOUSE OF MARITSA EAST 2 TPP, POWER UNITS 1-4” PROJECT Assessment for compliance of the project for “Depot and transportation chart for supplies to the limestone warehouse of the Maritsa East 2 TPP, Power Units... Научи повече
- 2007 - 2011 DESIGN AND CONSTRUCTION OF DRY SPENT FUEL STORAGE FACILITY (DSFSF) Financing: EBRD The DSFSF building bearing structure was single-span, one storey frame with 26 m opening. The walls in longitudinal and transversal direction were... Научи повече
- 2007 - 2008 PREPARATION OF A DOCUMENT PACKAGE FOR OBTAINING SPECIALIZED TRAINING LICENSES The project of elaborating a document package in order to obtain licenses for specialized training on activities in nuclear facilities has been developed in several... Научи повече
- 2007 - 2009 UPDATING THE EXISTING PROBABILISTIC SAFETY ANALYSIS, LEVEL 1 Updating was performed of the existing Probabilistic Safety Analysis (PSA), Level 1, for full power, low power and shutdown mode of operation, for Kozloduy NPP Units... Научи повече