Projects
- 2005 - 2006 CONSTRUCTION OF DATA TRANSMISSION RADIO-CHANNEL AND MODELING AUTOMATED INFORMATION SYSTEM FOR EXTERNAL RADIATION MONITORING (AIS ERM) The main objective of the project is construction of a redundant information channel through wireless communications connecting the base and monitoring stations of... Научи повече
- 2005 - 2006 CONSTRUCTION AND INSTALLATION WORKS AND START-UP AND ADJUSTMENT WORKS FOR THE TELEMECHANIZATION OF SIX SITES OF NEK EAD The task included the development of detailed designs as per the technical requirements, delivery and installation of the remote control instrumentation, putting the... Научи повече
- 2005 - 2005 TECHNICAL SUPPORT TO STATE ENTERPRISE RADIOACTIVE WASTE PROVIDED FOR THE CONSTRUCTION OF A SYSTEM FOR EMERGENCY PREPAREDNESS IN CASE OF RADIOLOGICAL ACCIDENTS Financing: PHARE Program Assessment of the on-site emergency planning - protected area: Assessment of the preventive and protection measures zone;... Научи повече
- 2005 - 2007 TUDY OF THE POSSIBLE CAUSES OF LEAKS FROM PRIMARY TO SECONDARY CIRCUIT, AND SOLUTIONS FOR ACCIDENT LOCALIZATION The task has been accomplished in the framework of Measure 26281 of the Modernization Program of Kozloduy NPP Units 5 and 6. The services provided under that project... Научи повече
- 2005 - 2008 CONSULTING SERVICES AS ARCHITECT ENGINEER OF THE NATIONAL ELECTRIC COMPANY FOR THE CONSTRUCTION OF THE BELENE NPP The project for providing consultancy services to NEK for the construction of the Belene NPP was performed in several stages. Activities related to the development... Научи повече
- 2004 - 2006 REHABILITATION OF THE BEARING STRUCTURE OF TRANSPORTATION CONVEYOR No. 113 IN MARITSA EAST 2 TPP The rehabilitation of the said bearing structure is implemented in two phases – design, and implementation as such. During phase 1, technological designs are... Научи повече
- 2004 - 2006 IMPROVEMENT OF THE SEISMIC STABILITY OF THE BEARING STRUCTURES OF THE KOZLODUY NPP BUILDINGS The project is implemented in the framework of Measure 19121 of the Kozloduy NPP Modernization Program. Detailed designing is carried out based on the analysis and... Научи повече
- 2004 - 2005 EQUIPMENT PERFORMANCE ANALYSIS OF THE SAFETY SYSTEMS IN CASE OF AN EARTHQUAKE IMPROVEMENT OF THE SEISMIC STABILITY OF SAFETY SYSTEMS’ EQUIPMENT The project has been prepared on Measure 21231 and Measure 19122 of the Modernization Program for Units 5 and 6 of Kozloduy NPP. The objective of Measures 21231 and... Научи повече
- 2004 - 2007 KOZLODUY NPP INFORMATION SYSTEM FOR OPERATIONAL ACTIVITIES MANAGEMENT (IS OAM) The Information System for Operational Activities Management (IS OAM) is intended for the collection, storage, processing and efficient use of data and information... Научи повече
- 2004 - 2007 INFORMATION SYSTEM DEVELOPMENT FOR OPERATIONAL ACTIVITIES MANAGEMENT The decision for development and implementation of Integrated Information System for Operational Activities Management (IS OAM) in KNPP was taken in 2004 and the... Научи повече
- 2004 - 2005 ANALYSIS OF THE POSSIBILITIES FOR CONTAINMENT BYPASS The task has been accomplished in the framework of Measure 24241 of the Modernization Program of Kozloduy NPP Units 5 and 6. The services of that project are as... Научи повече
- 2004 - 2009 ANALYSIS OF THE CAPABILITIES OF DESIGN SYSTEMS TO MANAGE BEYOND DESIGN BASIS ACCIDENTS The project is implemented within KNPP Units 5 & 6 Modernization Program Measure 26431. The project envisages conducting analyses of the Beyond Design Basis... Научи повече
- 2004 - 2005 DESIGN AND ENGINEERING DOCUMENTATION DEVELOPMENT, DESIGNER SUPERVISION AND COMMISSIONING OF CONTROL ROD DRIVE CONTROL SYSTEM FOR KOZLODUY NPP UNITS 5&6 The electrical equipment of the Control Rod Drive and Control Rod Position Control System of the reactor is designed for modernization of WWER-1000 (B-320) control... Научи повече
- 2004 - 2005 CENTRAL INFORMATION MEASUREMENT RADIATION MONITORING SYSTEM (CIMRMS-01P) OF KOZLODUY NPP UNITS 5&6 AND AUXILIARY BUILDING 3 The project is implemented within the KNPP Units 5&6 Modernization Program. Since the existing radiation monitoring system was obsolete and worn-out, in the... Научи повече
- 2004 - 2006 AUTOMATED RADIATION SAFETY MONITORING SYSTEM (ARMS) UPGRADING WITH RADIATION MONITORING PANEL The task is implemented in the framework of the KNPP Units 5&6 Modernization Program. Automated Radiation Safety Monitoring System (ARMS) instrumentation set is... Научи повече
- 2003 - 2012 PROVISION OF MANAGERIAL, CONSULTANCY, SUPERVISION, AND ENGINEERING SERVICES FOR THE REALIZATION OF BELENE NPP PROJECT PROVISION OF MANAGERIAL, CONSULTANCY, SUPERVISION, AND ENGINEERING SERVICES FOR THE REALIZATION OF BELENE NPP PROJECT The aim of the provided managerial,... Научи повече
- 2003 - 2005 COLLECTION AND PROCESSING OF INPUT DATA FOR THE REPLACEMENT OF THE UNIFIED COMPLEX FOR TECHNOLOGICAL FEATURES (UKTS) OF NORMAL OPERATION SYSTEMS AT UNITS 5&6 BY OVATION COMPUTER INFORMATION SYSTEM Risk Engineering Ltd. took part in the collection, verification and processing of the input data for the replacement of the non-system relay-based UKTS by a more... Научи повече
- 2003 - 2003 DELIVERY OF LEAK-TIGHT CABLE PENETRATIONS AND COMPONENTS In the framework of Units 5&6 Modernization Program, Measure 14151 (Reconstruction and Modernization of Reactor Internals Monitoring System – Hindukush),... Научи повече